# The Ship in 7 Days week

URL: https://gocutline.com/templates/ship-in-7-days/

A launch week for builders: four hours of building every day from 09:00, two hours of design on Monday and Tuesday afternoons, launch preparation on Thursday, and the launch itself on Friday at 16:00, with the gym three mornings.

## Why it works
- **A fixed launch time** makes the week finite. Friday at 16:00 is not negotiable.
- **Design early in the week** so building is not blocked on it later.
- **Launch prep on Thursday:** copy, screenshots, the post, the list of people to tell.

## After the launch
Post the week on the Floor. A launch week with 30+ hours of building is worth showing.

## Use it
Open the [week builder](https://gocutline.com/#try), paste the line below and adjust the times to your life:

> Build 4h daily at 9, design 2h Mon Tue at 14, launch prep 2h Thu at 14, ship it Fri at 16, gym 3x at 7

The week: Build 4h daily at 9, design 2h Mon Tue at 14, launch prep 2h Thu at 14, ship it Fri at 16, gym 3x at 7

## Questions

**Can you really ship a product in 7 days?**
You can ship a first version of something small. The week works because the scope is cut to fit the week, not the other way round.

---
Cutline: Cutline is a weekly calendar and planner that turns time blocks into XP, levels and streaks. You plan your week in blocks, tick each one off when it is done, and see your progress on a social feed (the Floor) and a weekly leaderboard (the Arena). Planning and budgeting are free; paid plans add a badge, posting, messaging, shared calendars and lower selling fees, from $9 a month. Pro is free to try for 7 days.
Facts: https://gocutline.com/facts/ · Updated 2026-10-23
